YourHomePlanet.comECOLODGICAL
LANGUAGE... ›  ENGLISH · FRANÇAIS · ESPAÑOL · DEUTSCH · ITALIANO · PORTUGÛES · NORSK · OTHER
INTRODUCTIONSTATISTICSDESIGNOPERATIONCHECKLISTEMSAUDITACTION PLAN

LEARN
Module 1 | 2 | 3

  


Search Ecolodgical

PREVIOUS PAGE
NEXT PAGE 

  

No comments on this topic.

[COMMENT ON THIS TOPIC]

SEARCH GBLIST
 
SEARCH BIGGREEN
 

ENVIROMENTAL DESIGN ELEMENT
Environmental Impacts Operation vs Construction

Although environmental building design is critically important to reduce environmental impacts of an operation, on average the operation of the building over its lifetime (i.e. 50 years) contributes 5 times the impacts of the initial construction. Thus, a life-cycle analysis is required to fully understand the environmental impacts of a building.

"Viewed over a 30-year period, initial building costs account for approximately just two percent of the total, while operations and maintenance costs equal six percent, and personnel costs equal 92 percent" (1996).

FIGURE 1: Costs of various buildings over a life-cycle (100 years).



Source: http://www.cdnarchitect.com/asf/perspectives_sustainibility/...

CHECKLIST

Focus initial efficiency and waste reduction efforts in the operation of the hotel.



<< PREV NEXT >>


ˆ... top

 

Copyright © 2003 -
Updated: December 6th, 2002